Water Heater Replacement

Permits are required for all water heater replacements. The permit application (PDF) may be  emailed or submitted over the counter at City Hall.

If converting to a heat pump water heater, the following documentation will be required, along with the above application.

  • Floor plan
  • Single line electrical drawings
  • Electrical load calculations (PDF). Load calculations not necessary if main service panel is 200A or greater.
  • Manufacturer's specification sheet

Resources

Silicon Valley Clean Energy (SVCE) offers significant funding, incentives, and free services to support single-family houses, multi-family buildings, businesses, schools, and other facilities upgrade to electric at low to no-cost. Visit the Go Electric webpage to learn more.